Marport-Soyak Port
| Position | Lat : 40 57′ 08” N Long : 28 40’07” E |
| Port Management | MARPORT LIMAN ISLETMELERI A.S. Phone: 90 (0212) 875 45 25 |
| ISPS | Port Facility :Statement No : 0234028Level : 1
PFSA date : |
| Pilotage | Compulsory. Pilotage services is carried out by Arpas Romorkaj Pilotaj Ticaret A.S. |
| Towage | 3 tugs availiable to asist, which 2 Tugs of 30 Bollard Pull and 1 tug of 55 Bollard Pull |
| Density | 1.014 – 1.016 |
| General Info | Mainly scrap, iron products, coal and containers handled.The total pier length is 915m with draft of 10-14,5m |
| Equipment | |
| Working Hours | 24 hours with shifts 0800-1600 / 1600-2400 / 2400-0800 |
| Garbage | Compulsory. Collected by Istanbul Metropolitan Municipality with coordination of Port Complex Management |
| Repairs | Minor repairs available. |
| Storage | |
| Fresh Water | Availiable from the quay and barge |
| Provision | Availiable |
| Bunkers | Availiable by truck and barge |
| Medical Facilities | Port Facility has a small hospital for emergencies, State and Private Hospitals are available. |
| Airport | The nearest international airport is Istanbul Ataturk Airport with an approx distance of 14km |


Marport Soyak Terminali, Soyak Holding’e ait Soyak Hazır Beton Sanayi İnşaat ve Ticaret A.Ş.’den Soyak Limanı’nın (S-Port) satın alınmasıyla, 12 Aralık 2003 tarihinde Marport bünyesine katıldı.
2003 yılında iş hacmi 35.000 TEU olan Marport Soyak Terminali’nde, bu hacmin 2004 yılında artırılması planlanıyor